To compare two interior quotes, put them next to each other and tick off the same lines on both. A quote that cannot answer a line is not cheaper, it is unfinished. Print this list or copy it into a notes app and fill it in for each firm.
This is the detailed version of our guide on how to compare interior design quotes. Use that guide first to set the scope, then this list to check each line.
Scope: what is being built
- Every room is listed, with the units in it: kitchen, wardrobes, TV unit, study, pooja unit, bed back panel.
- Sizes are written in feet or sq ft, not "as per design".
- False ceiling, painting and electrical work are either listed or marked not included.
- Civil changes, such as moving a wall or tiling, are either listed or marked not included.
Materials: what it is made of
- The plywood grade (MR, BWR or BWP) is named for each unit, and BWP is used under the sink and in wet areas.
- The shutter finish is named: laminate, acrylic or PU, with the thickness where it applies.
- The hardware maker and type are named, including whether hinges and channels are soft-close.
- The countertop material and thickness are named.
- Brand and grade are written for paint and laminate, not "premium" or "good quality". Our guide on brand, grade and MRP explains the terms.
Price: how the total is built
- You know whether prices are a fixed rate, itemised, or material cost plus a fee.
- Labour and installation are listed, or clearly included in a stated rate.
- GST is shown separately, or the quote says it is included. Confirm with the firm.
- Transport, loading and site cleaning are included or listed.
- Design fees and the number of design revisions are stated.
Exclusions: what is left out
- Appliances, sinks and taps, curtains, loose furniture and decorative lights are listed as included or excluded.
- The firm has written an exclusions list, room by room.
- Society charges, deposits and lift or parking arrangements for material delivery are discussed.
Time, payments and warranty
- There is a handover date and a note on what happens if it slips.
- Payments are tied to stages such as design sign-off, material delivery and installation, with the last instalment after snag fixing.
- Warranty is written separately for carcass, hardware and finishes, with what is not covered.
- There is a named contact for after-handover problems.
How to use the checklist
Give each firm a point for every line it answers clearly in writing, and note every blank. Where a line differs, ask the firm why before you compare totals. A lower total with more blanks usually means more to pay later.
Check the total against an independent number
Run your home through the DecorYaar full-home estimator to see a planning range for your size and finish level. Prices exclude GST and are indicative ranges, not a quote. If a quote sits far outside the range, ask what is driving the difference.